Building Now Fully Enclosed!

  • Metal panels are now wrapping around the front of the building.

  • All windows are officially installed.

  • Stone is now in place in the south parking lot awaiting paving.

  • Casework is now going into the upper classrooms as flooring continues to be placed from top to bottom of the building.

  • The electrician continues to place lights throughout the corridors.

  • The plumber is working through the bathrooms, installing fixtures. Water fountains have also been installed in the hallways.

  • Wood flooring has arrived in the gym, the installer is awaiting the base, and installation will commence.